H&P, Inc.
    • Why H&P
    • HSE
    • Performance Results
    • Types of Drilling
    • Performance Based Contracts
    • Advanced Well Engineering
    • Survey Management
    • Land Rigs
    • FlexRig® Fleet
    • T-Series Fleet
    • Automation
    • Rig Equipment
    • Rig Floor
    • Drilling
    • Offshore Drilling
    • Where We Drill
  • Technologies
  • Resources
    • About H&P
    • Leadership
    • Our People
    • Community Investment
    • Sustainability
  • Investor Hub
  • News & Insights
  • Find a Job
Get in touch
Did you know?

In the last 10 years in US Land H&P has drilled approximately 600 million feet.

That is nearly 24 times around the earth!

Did you know?

In the last 10 years in US Land H&P has drilled approximately 600 million feet.

That is over halfway to the moon!

Did you know?

In the last 10 years in US Land H&P has drilled approximately 600 million feet.

That’s enough to drill deeper than Mount Everest… 68,000 times 

Did you know?

In the last 10 years in US Land H&P has drilled approximately 600 million feet.

That is a straight line from New York to LA – 43 times! 

Did you know?

Crew members are rewarded for submitting safety observations and intervening if they see risky situations. Actively C.A.R.E.® is more than just a tagline.

Did you know?

Our vertically integrated model includes global manufacturing, enabling faster rig deployment and consistent quality across continents.

Did you know?

H&P has drilled more wells, with more data than the largest operators combined.

Did you know?

Our SSHE reporting system captures and mitigates potential SIFs before they occur, reinforcing a culture of proactive safety

Did you know?

H&P customers drilling 10 wells save an average of 24 days and over $1.5 million compared to competitors, due to fewer trips, less NPT, and faster cycle times. 

Did you know?

Our Real-Time Operations Centers monitor and optimize drilling performance around the clock, preventing issues before they occur.

Did you know?

We lead the industry with 2,500+ rig years of AC drive experience—delivering smoother, more efficient drilling across all geologies.

Did you know?

Even as footage drilled continues to rise, H&P has reduced emissions intensity by 33% since 2018.

Did you know?

In 2024, Survey Management corrected almost 900K surveys.

Did you know?

In 2024, StallAssist® technology mitigated over 25K stalls.

Did you know?

In 2024, AutoSlide® technology slid for over 885K feet. That’s like stacking 1,770 Eiffel Towers on top of each other.

Did you know?

In 2024, Autodriller Pro drilled almost 30k feet, or about 83 American football fields.

Did you know?

In 2024, FlexFusion® technology automated 1.5+ million processes on almost 4k wells.

View all results →

No results

Resources

Technical Paper


  • Advanced Well Engineering
  • Autodriller Pro Control System
  • Automated HSE Systems
  • AutoSlide® technology
  • Bit Guidance System
  • Digital Roadmap® technology
  • FlexB2D® 2.0 technology
  • FlexFusion™ technology
  • FlexOscillator® technology
  • FlexRobotics(TM)
  • FlexTorque® technology
  • FlexVision Camera Suite
  • Power Management
  • Rig Floor Automation
  • StallAssist® technology
  • Survey Management
  • Technical Paper

    Enhanced Wellbore Placement Accuracy Using Geomagnetic In-Field Referencing and Multi-Station Correction

    Abstract Reduced lateral spacing in congested oil and gas fields requires advanced techniques to prevent collisions while drilling. Anti-collision separation factors depend on the accuracy…

  • Technical Paper

    Fifty Ways to Leave Your Wellbore: An Honest Look at the Causes and Costs of Unplanned Sidetracks

    Abstract Unplanned sidetracks are low-frequency high-cost events that have meaningful negative impact on the economics of oil field development. While it is clearly desirable to…

  • Technical Paper

    Improving Directional Survey Accuracy through Real-Time Operating Centers

    Abstract Standard directional surveying practices are subject to numerous error sources which can cause inaccurate placement of the wellbore. This is problematic because inaccurate wellbore…

  • Technical Paper

    Improving Wellbore Placement Accuracy Using Stratigraphic Misfit Heatmaps

    Abstract Accurate wellbore placement is of key importance in producing and developing unconventional resources. For cost reasons, unconventional wells areusually drilled with gamma radiation data…

  • Technical Paper

    Modelling the Economic Impact of Spacing Uncertainty in Unconventional Long Laterals Due to Common Survey Practices

    Abstract Finding an optimal lateral spacing is crucial to maximizing the return on investment for unconventional assets. The estimates regarding these lateral spacings were made…

  • Technical Paper

    Optimizing Lateral Well Spacing by Improving Directional Survey Accuracy

    Abstract Optimizing lateral well spacing is a challenging problem that has significant economic consequences. The intent is to drill the fewest number of horizontal wells…

  • Technical Paper

    Optimizing Wellbore Trajectories for Closed Loop Geothermal Operations

    Closed-loop geothermal presents a unique opportunity, with relatively few constraints to satisfy (e.g. target depth, lateral length). This study uses this freedom in trajectory design…

  • Technical Paper

    Real-Time Directional Survey Quality Improvement Using Web-Based Technologies

    Abstract Optimal wellbore placement and collision avoidance requires accurate real-time steering of directional wells. Uncertainties in the wellbore position are accounted for by industry standard…

  • Technical Paper

    Simulation of Recovery Losses Due to Positional Errors in Wellbore Placement

    Abstract In unconventional resources, horizontal wells are drilled in parallel at a spacing distance designed to maximize drainage of the reservoir. Lateral well spacing should…

  • Technical Paper

    Using Autonomous Marine Vehicles to Enable Accurate Wellbore Placement in the Arctic

    Abstract This paper describes a study using an autonomous marine vehicle with satellite communications, to accurately collect and deliver in real-time magnetic measurements, to calculate…

  • Technical Paper

    Using Hybrid Propulsion Autonomous Marine Vehicles to Better Characterize Geomagnetic Fields Offshore

    Abstract We present a study conducted to develop and validate new capabilities for offshore geomagnetic surveying that employs the autonomous marine vehicle (AMV) to map…

  • Technical Paper

    Validation of Directional Survey Data Against Positional Uncertainty Models

    Abstract Positional uncertainty is a critical component of managing collision risk while drilling. Ensuring that survey data meet the requirements of their uncertainty models has…

Get in touch

Over a century of innovation, performance, 
and precision in drilling.

  • Supplier Information
  • Careers
  • Investor Hub
  • Employee Login
  • Customer Login
Did you know?

In the last 10 years in US Land H&P has drilled approximately 600 million feet.

That is nearly 24 times around the earth!

Did you know?

In the last 10 years in US Land H&P has drilled approximately 600 million feet.

That is over halfway to the moon!

Did you know?

In the last 10 years in US Land H&P has drilled approximately 600 million feet.

That’s enough to drill deeper than Mount Everest… 68,000 times 

Did you know?

In the last 10 years in US Land H&P has drilled approximately 600 million feet.

That is a straight line from New York to LA – 43 times! 

Did you know?

Crew members are rewarded for submitting safety observations and intervening if they see risky situations. Actively C.A.R.E.® is more than just a tagline.

Did you know?

Our vertically integrated model includes global manufacturing, enabling faster rig deployment and consistent quality across continents.

Did you know?

H&P has drilled more wells, with more data than the largest operators combined.

Did you know?

Our SSHE reporting system captures and mitigates potential SIFs before they occur, reinforcing a culture of proactive safety

Did you know?

H&P customers drilling 10 wells save an average of 24 days and over $1.5 million compared to competitors, due to fewer trips, less NPT, and faster cycle times. 

Did you know?

Our Real-Time Operations Centers monitor and optimize drilling performance around the clock, preventing issues before they occur.

Did you know?

We lead the industry with 2,500+ rig years of AC drive experience—delivering smoother, more efficient drilling across all geologies.

Did you know?

Even as footage drilled continues to rise, H&P has reduced emissions intensity by 33% since 2018.

Did you know?

In 2024, Survey Management corrected almost 900K surveys.

Did you know?

In 2024, StallAssist® technology mitigated over 25K stalls.

Did you know?

In 2024, AutoSlide® technology slid for over 885K feet. That’s like stacking 1,770 Eiffel Towers on top of each other.

Did you know?

In 2024, Autodriller Pro drilled almost 30k feet, or about 83 American football fields.

Did you know?

In 2024, FlexFusion® technology automated 1.5+ million processes on almost 4k wells.


© 2025 Copyright Helmerich & Payne, Inc.
  • Privacy & Settings
  • Disclaimer
  • Facebook
  • Instagram
  • LinkedIn
  • X
  • YouTube

Notifications