Case Study
Case studies help demonstrate our operational excellence, drilling expertise and customer-centric approach to deliver better drilling outcomes.
Case studies help demonstrate our operational excellence, drilling expertise and customer-centric approach to deliver better drilling outcomes.
Operator Saves 12 hours+ of trip time, equating to $35,000 USD Challenge A Well Site Leader working on a rig in West Texas’ Delaware Basin…
H&P’S ADVANCED WELL ENGINEERING TEAM PROVES LIGHTER ARCHITECTURE WAS POSSIBLE AND PROVIDES RECOMMENDATIONS TO EXECUTE Challenge Tullow Oil in West Africa wanted to deploy a…
H&P Identified a 7 Degree Offset That Could Have Left the Operator 1,000 ft. Off Target Challenge An exploration and production company with operations in…
Head-to-head comparison proves science-based directional drilling approach enhanced bit and BHA integrity and reduced time to target Challenge A major operator was drilling in the…
H&P Reduces BHA Count From 3 to 1 and Saves an Estimated $165,000 Challenge A major operator drilling in the Woodford formation of central Oklahoma…
Permian Operator Compares Experienced Human Directional Drillers and Automation Technology – and the Variables Held Constant Challenge Hunt Oil was drilling several wells in the…
Challenge An operator working in the Midland Basin had been achieving mid-tier drilling performance overall but had been falling short in one key area. Their…
Challenge An operator drilling out of the Meramec formation in Oklahoma historically struggled with suboptimal rates of penetration (ROP) due to stick slip and whirl.…
Head-to-Head Comparison Proves Significant Gains in Drilling Performance Challenge As drilling parameters become more complex and production timelines tighten, operators need to know that every…
Working together to deliver better drilling outcomes Planning and Preparation Meticulously organized strategies focused on achieving the operator’s performance goals Field-Proven Technology H&P’s FlexFusion® technology…
Customized Solution Helps Prevent Future Failures in Lower Completion Challenge An operator in the North Sea faced a lower completion lock-up 800m above total depth…
Proven Reliability Gives Major Operator Confidence to Increase Build Rate Challenge A major oil and gas operator was interested in implementing technology and automation solutions…