Removal of one casing string from well architecture projected to save Tullow oil $4m per well
PROJECT OVERVIEW
Location: Deepwater, West AfricaOutcomes: Increase Reliability, Increase Profitability, Reduce Human Variability, Reduce CO2eEmissionsTechnology & Services: Advanced Well Engineering
H&P’S ADVANCED WELL ENGINEERING TEAM PROVES LIGHTER ARCHITECTURE WAS POSSIBLE AND PROVIDES RECOMMENDATIONS TO EXECUTE
Challenge
Tullow Oil in West Africa wanted to deploy a lighter well architecture for their upcoming drilling campaign, including six low reach-out wells. The lighter architecture would remove the standard surface casing and run a combined surface/technical casing after the conductor pipe had been jetted in place. The operator had concerns that, should there be cement shortfall and if the conductor pipe is unable to support the axial load, the loads applied to this casing string would exceed the design factor of the casing due to the high bending stresses generated from excessive buckling.
Solution
As part of Advisory Solutions, H&P’s Advanced Well Engineering team performed an in-depth pre-analysis that considered several sensitivities related to the well architecture, cement shortfall, hole over gauge and expected loads. Their industry leading stiff-string Torque & Drag model allowed the contact forces, deflected shape, and bending stresses to be assessed along the casing string length. The results and conclusions led to the refinement of the final architecture, considering all the unknowns from the operations.
Operator projected to save roughly $4M per well, a total savings in the region of $12-24M USD
Outcome
H&P’s Advanced Well Engineering team was able to provide the operator with a detailed architecture as well as further recommendations to help ensure the well could withstand the potential loads it could be subjected to. This architecture will be deployed on a minimum of three upcoming wells, with a potential of six wells. The cost saving and reduction in CO2 emissions is projected to be $4M USD and 620mT per well. Resulting in anticipated savings of $24M USD and 3600mT CO2e overall, for 6 wells.
Past performance is not a guarantee of future results. Any statements regarding past performance are not guarantees of future performance and actual results may differ materially. © 07/2022 HPCS020
Related Case Study
-
Next-level drilling automation lowers drilling costs and results in better hydrocarbon production potential
Permian Operator Compares Experienced Human Directional Drillers and Automation Technology – and the Variables Held Constant Challenge Hunt Oil was drilling several wells in the…
-
Integrated drilling solutions Break records while reducing operator’s time to target
Operator Sees Roting ROP Improvement of 132%, Slide ROP of 53% Challenge Drilling for gas in the Haynesville presents unique challenges such as high pressure/high…
-
Permian basin operator achieves 15% higher ROP and 21% improvement in back to drilling time
H&P Automation Technology Significantly Improves Efficiency and Preserves Bit Life Challenge An operator in the Permian basin had been drilling similar well types for several…
-
Comprehensive solution increases ROP while curving and maximizes footage to boost production
Proven Reliability Gives Major Operator Confidence to Increase Build Rate Challenge A major oil and gas operator was interested in implementing technology and automation solutions…
Related Product Literature
-
MagVAR™ Omni Fact Sheet
MagVAR™ Omni technology elevates standard surveying practices by delivering more precise wellbore trajectory and shape.
Related Technical Publications
-
Casing Wear and Stiff String Modeling Sensitivity Analysis – The Contribution of DP Pipe-Body and Tool-Joint on Casing Contact
Abstract Casing wear due to pipe body and tool-joint of Range 2 and Range 3 DP is compared using a stiff-string torque & drag &…
-
Early Identification of Drilling Collision Risk Using MWD Survey Quality Data
Abstract By identifying changes in the error characteristics of magnetic surveys while drilling, crews can be alerted early on to a potential close approach with…
-
Fifty Ways to Leave Your Wellbore: An Honest Look at the Causes and Costs of Unplanned Sidetracks
Abstract Unplanned sidetracks are low-frequency high-cost events that have meaningful negative impact on the economics of oil field development. While it is clearly desirable to…
-
Improving Surface Oscillation Tools Performance Using Time-Domain Dynamics and Torque and Drag Models
Abstract Overcoming friction in sliding mode represents a challenging task when drilling an unconventional well with a long lateral section. Among the possible ways to…