
Customized Solution Helps Prevent Future Failures in Lower Completion Challenge An operator in the North Sea faced a lower completion lock-up 800m above total depth…

Proven Reliability Gives Major Operator Confidence to Increase Build Rate Challenge A major oil and gas operator was interested in implementing technology and automation solutions…

AutoSlide® Technology Now Holds the Operator Record Curve Time at 4.6 Hours Challenge A major operator in the Midland Basin had been using the H&P…

Bit Guidance System Helps Operator Avoid Sidetrack and Hefty Costs Challenge An operator in South Texas was aiming to land their curve with pinpoint accuracy…

Automated high torque wrench leads to 60% less deformation when applying force to drillpipe.


H&P Saves Operator 11 Days and Lowers BHA Count by 9% Challenge An operator in the Delaware basin was proactively looking for ways to maximize…